Skip to main content

Critical Path Partners

ca.criticalpathpartners/primavera-p6-forensic-schedulingVersion 2.10.17

Primavera P6 XER forensic scheduling: AACE windows, TIA, impacted as-planned, DCMA-14, Monte Carlo.

Status

Responds370 msAnswered our handshake without sign-in.

Registry data may be out of date

We could not refresh it, so this page shows the last copy.
Last checked
Nov 14, 2026, 13:41 UTC
Latency
370 ms
Remotes responding
1 of 1
Sign-in
No sign-in
Hosting
Hosted outside the EU (detected)
Registry data as of
Nov 14, 2026, 22:14 UTC

Data from the official MCP Registry, checked by run.zero. How we check

Connect

Streamable HTTP
https://mcp.criticalpathpartners.ca/mcpResponds370 ms
No sign-in

Claude Code

claude mcp add --transport http primavera-p6-forensic-scheduling https://mcp.criticalpathpartners.ca/mcp

Claude Desktop and claude.ai

Settings > Connectors > Add custom connector
Name: primavera-p6-forensic-scheduling
Remote MCP server URL: https://mcp.criticalpathpartners.ca/mcp

Cursor

{
  "mcpServers": {
    "primavera-p6-forensic-scheduling": {
      "url": "https://mcp.criticalpathpartners.ca/mcp"
    }
  }
}

VS Code

code --add-mcp '{"name":"primavera-p6-forensic-scheduling","type":"http","url":"https://mcp.criticalpathpartners.ca/mcp"}'

Built your own server? run.zero hosts MCP servers on European infrastructure.

Host your own MCP server on run.zero

Tools

14 tools

Tools of Critical Path Partners
Read-only
Idempotent
Open world
claim_workbench_evidence_ledgerForensic claim workbench — analyzes a folder of mixed evidence (XER chain + MSG/PDF/DOCX/XLSX correspondence) and produces a unified workbench dashboard. Built from the real-world workflow where forensic delay analysis starts from a folder containing schedule updates, owner correspondence, RFIs, change orders, and meeting minutes — all mixed together. The workbench produces: - Evidence ledger (chronological): all artifacts dated and summarized - Schedule chain-diff: 14-category manipulation log (TASKPRED add/remove, constraint flips, retroactive baseline edits, completion reversals) - Rolling baseline: per-activity baseline-at-introduction across the entire XER chain - Trust score: statistical impossibilities flagged (zero-duration-variance schedules, no-new-activities, every-activity-hits-baseline, etc.) - Slip-to-evidence cross-reference: each forensic slip auto-paired with documents in its window mentioning affected activity codes - Unified HTML dashboard with all of the above Use this tool when starting forensic delay analysis from raw evidence. For single-XER-pair forensic with hand-prepared events, use ``forensic_windows_analysis`` instead. Two input modes (supply exactly one): * ``folder_path`` — the ``staged_folder_path`` that POST /stage returned for YOUR upload, passed back exactly as received. No other folder is accepted: not a desktop path, not the server temp directory, not another folder inside it. * ``evidence_files`` — a CONTENT MANIFEST: a list of ``{"name": str, "content_b64": str}`` entries carrying base64-encodNot declaredNot declaredNot declaredNot declared
collapsed_as_builtCollapsed As-Built / But-For analysis on a post-impact XER. Implements AACE RP 29R-03 §3.8 Modeled / Subtractive / Single Simulation method (paired with MIP 3.3 Windows for the dual-method gap report per SCL §11.5). Validates a forensic windows analysis (MIP 3.3) by independently computing the same project drift via subtractive removal of delays from the as-built schedule. For each delay event, the as-built duration of every ``affected_activity`` is shortened by ``impact_days`` working days on that activity's calendar (or removed entirely if ``removal_method="remove"``), then CPM re-runs and the resulting "but-for" finish date is compared to the as-built finish. Cumulative pass removes ALL events at once for a project-level but-for finish. Every finish shift is stated in working days on ``workday_calendar``; the calendar-day span of the same shift is kept beside it, and ``day_unit_basis`` names the unit of every bare ``*_days`` key in the result. Use this tool when opposing counsel demands a but-for analysis or you need a dual-method validation pairing §3.3 (windows) with §3.8 (collapsed-as-built). For prospective fragnet insertion (MIP 3.7), use ``time_impact_analysis_fragnet`` instead. Args: as_built_xer_path: server-side post-impact XER (after delays incurred). as_built_xer_content: full text of post-impact XER (alternative for hosted/remote use). Supply EXACTLY ONE of path/content. delay_events: list of event dicts. Each must have ``event_id``, ``affected_activities`` (list of task_codes), and ``impact_days`` (number of working days on the affected activity's calenNot declaredNot declaredNot declaredNot declared
concurrent_delay_matrixBuild the per-window x per-party concurrent-delay attribution matrix from a chronological list of XER snapshots. Implements the per-window concurrency view per AACE RP 29R-03 §3.3.I (apportionment) and §4.2 (concurrency). Where ``forensic_windows_analysis`` answers "how many days does each party own across the whole project?", this tool answers "how did each window distribute its shift across the parties?" — useful when defending or attacking concurrency findings on a window-by-window basis. CPP conservation check, per the AACE 29R-03 §3.3.E.13 requirement that the summed per-period net impacts equal the difference between the first schedule update and the last schedule update used in the evaluation: the sum of per-party column totals equals the sum of per-window completion shifts within ±1 day of rounding. The column-total definition is this tool's own bookkeeping, not an AACE rule. The ``conservation_check`` field on the response reflects this; ``conservation_diff_days`` carries the exact gap. IMPORTANT — conservation is NOT attribution. ``conservation_check`` can be True (the columns sum to the grand total) even when 100% of the shift lands in the Unattributed column, i.e. no party owns any of the drift. Read ``unattributed_share_pct`` and ``high_unattributed_share_warning`` to know whether a meaningful apportionment actually occurred. A fully-unattributed matrix conserves perfectly but attributes nothing — never present its green conservation check as a validated apportionment. Use this tool when you only need the matrix view; use ``forensic_windows_analysis`` for the full claim. Args: schedules: chronologicallyNot declaredNot declaredNot declaredNot declared
critical_path_validatorCritical-path validation, logic health, and DCMA-14 assessment of a Primavera P6 schedule. Runs the CPP critical-path validator: checks for false criticality, constraint-driven CP segments, open ends, broken logic, and surfaces a DCMA-14 block with the 14 metrics (logic, leads, lags, FS%, hard constraints, high float, high duration, invalid dates, resources, missed tasks, critical tasks, CPLI, BEI, etc.) at the chosen profile threshold (commercial / nuclear / mining). When ``baseline_xer_path`` is supplied, BEI (Baseline Execution Index) is computed. Use this tool to grade a schedule's logic health and find what should be fixed before forensic analysis. For the full HTML health-dashboard PDF render, use ``dcma14_health_check``. Args: xer_path: server-side path to the schedule XER. xer_content: full text of the schedule XER (alternative for hosted/remote use). Supply EXACTLY ONE of path/content. project_index: which project to analyze in a multi-project XER (0 = first/primary; default). profile: DCMA threshold profile - 'commercial' (default), 'nuclear', 'mining'. baseline_xer_path: optional server-side baseline XER for DCMA BEI. baseline_xer_content: optional baseline XER text content (alternative). Returns: Full validator result dict including: - 'project_name', 'data_date', 'analysis_timestamp' - 'total_activities', 'complete', activity counts - 'critical_path_findings': list of issues - 'logic_findings', 'constraint_findings' - 'overall_rating' / 'overall_score' / 'overall_confidence': LOGIC-HEALTH verdict only (open Not declaredNot declaredNot declaredNot declared
dcma14_health_checkFull Schedule Health Dashboard HTML report — DCMA-14 + CPLI + BEI + variance/slip register against the baseline. Wraps the CPP Schedule Health Review skill, which produces a self-contained ~1.3 MB HTML dashboard. The dashboard renders DCMA metrics, charts, baseline-vs-current variance, slip register, GAO/AACE compliance bands, and a reproducibility manifest. Baseline XER is OPTIONAL as of Round 7 (Fix MCP-8). When omitted, the tool runs in "degraded mode": the current XER is used as its own baseline for a synthetic 0-variance run. The result carries ``degraded_mode: true`` and ``degraded_mode_reason`` explaining that BEI / variance / slip register KPIs are NOT meaningful in this mode. Supply baseline_xer_path or baseline_xer_content to get the real two-XER variance dashboard. REQUIRES Node + Playwright on the server (the dashboard renders via headless Chromium). The tool returns a clear error if either prerequisite is missing. Use this tool when you need the formal HTML deliverable. Do NOT treat ``critical_path_validator`` as a JSON view of this tool. It runs CPP's other DCMA-14 engine (``critical-path-validator/scripts/dcma14.py``). Since 7 November 2026 both engines, and CPP Lens, measure to one written definition (``_cpp_common/references/DCMA_DEFINITION.md``, published at criticalpathpartners.ca/dcma-14-definition.html), and every engine's test suite checks it against the same hand-worked parity fixtures, check by check and count by count. They remain two programs with different outputs: this tool renders the client deliverable and grades it A to F (CPP's convention, not DCMA's, given only when at least 10 of the 14Not declaredNot declaredNot declaredNot declared
forensic_windows_analysisRun forensic windows analysis (AACE RP 29R-03 §3.3, MIP 3.3 Observational / Dynamic / Contemporaneous As-Is) across multiple Primavera P6 XER snapshots and return the full analysis dict. This is the headline forensic tool — it computes per-window completion shifts, per-window slip registers (per-activity slip with a critical flag (total float of zero or less, or the driving path in a schedule with negative float)), per-window duration growth on critical-path activities, per-window per-party attribution (Owner / Contractor / Concurrent / Force Majeure / Unattributed), and cumulative project drift from baseline. The attribution math satisfies the CPP conservation check, per the AACE 29R-03 §3.3.E.13 requirement that the summed per-period net impacts equal the difference between the first schedule update and the last schedule update used in the evaluation (per-party day buckets sum to project drift within ±1 day, no cascade-double- counting). Use this tool for the full multi-window forensic claim. If you already have a windows result and only want the per-window × per-party grid view, call ``concurrent_delay_matrix`` instead. Args: schedules: list of dicts in chronological order. Minimum 2 entries (baseline + at least one update). Each dict must contain ``label`` (str) and EXACTLY ONE of: - ``xer_path`` — server-side filesystem path, OR - ``xer_content`` — full XER text content. Use ``xer_content`` when calling a hosted MCP server from a remote client whose XER lives locally. project_name: optional override; auto-picked from XER if "". baseline_idx: which entNot declaredNot declaredNot declaredNot declared
impacted_as_plannedImpacted As-Planned (IAP) on an unprogressed as-planned baseline. Implements AACE RP 29R-03 MIP 3.6 (Modeled / Additive / Single Base) and SCL Protocol 2nd ed. §11.6(a). Two modes. **screen** (default): inserts each delay fragnet into the as-planned baseline, first one at a time and then all together, re-runs CPM, and reads the joint impact against verdict bands (NO SIGNAL, LOW SIGNAL, MODERATE SIGNAL, STRONG SIGNAL, or INDETERMINATE when the joint pass fails). Use it as a quick read on whether a delay claim has legs before a fuller analysis. The sum of the one-at-a-time impacts is reported beside the joint impact; ``overstatement_days`` is the difference, from fragnets that share a path. Check each ``per_fragnet[].status`` before quoting a figure: a fragnet that failed on its own carries ``status`` "error" and its ``error``, and is left out of the one-at-a-time sum. The joint pass inserts every fragnet together, so read ``joint.status`` and the "iap-joint" warnings too: with a bad fragnet the joint pass can fail (verdict INDETERMINATE) or run without the ties it could not insert. **rebut**: tests an opposing expert's IAP submission. Supply at least one of: ``opposing_impacted_xer_path`` or ``opposing_impacted_xer_content`` (tier A: re-runs their impacted schedule and diffs it against the baseline), ``opposing["fragnets"]`` (tier B: re-models their fragnets on the baseline), or ``opposing["claimed_impact_days"]`` (tier C: their stated figure). IAP does not look at what actually happened on site: it measures the planned logic plus the inserted delays. The result carries ``iap_method_caveat`` saying so, and a ``precondition`` Not declaredNot declaredNot declaredNot declared
monte_carlo_p50_p80Monte Carlo Schedule Risk Analysis — P10/P50/P80/P90 completion-date forecast for a Primavera P6 schedule. Implements an AACE-style quantitative SRA (the same math as CPP's browser Tool_11 Portfolio Risk Engine, scripted Python counterpart). For each iteration, every activity duration is sampled from the chosen distribution (Triangular, BetaPERT, Uniform, Lognormal, etc.) parameterized by % of baseline duration; CPM re-runs and the project finish date is recorded. After all iterations, P10/P50/P80/P90 completion dates and a sensitivity tornado (per-activity correlation to project finish) are reported. Use this tool when you need probabilistic completion forecasts or a tornado/sensitivity ranking. For the QRAMM-aligned five-level maturity badge (AACE 122R-22) on the result, pipe the response into ``qramm_maturity``. Args: xer_path: server-side path to the schedule XER. xer_content: full text of the schedule XER (alternative for hosted/remote use). Supply EXACTLY ONE of path/content. iterations: number of MC iterations (default 5000). distribution: 'Triangular', 'BetaPERT', 'Uniform', 'Lognormal' (case-insensitive — passed through). optimistic_pct, most_likely_pct, pessimistic_pct: % of baseline duration for the distribution params (defaults: 85 / 100 / 120). seed: optional fixed seed for reproducibility (0 = system entropy = non-reproducible). output_dir: optional output dir; tempdir if "". company: optional, the firm the dashboard carries (title block, print cover). Blank unless supplied, and blank carries no fiNot declaredNot declaredNot declaredNot declared
path_explorerLogic-trace driver-chain explorer — answers "WHY is this activity critical?" and "WHAT does it drive?". Traces driving predecessors backward from a target activity to project start (the "why critical" chain) and/or driving successors forward to project finish (the "what it drives" chain). Detects constraint-driven artificial criticality and cites AACE RP 49R-06 when found. Supports multiple parallel critical paths (MCPM) and near-critical paths. Use this tool when investigating a single activity's logic chain. For a project-wide CP / logic health audit, use ``critical_path_validator``. Args: xer_path: server-side path to the schedule XER. xer_content: full text of the schedule XER (alternative for hosted/remote use). Supply EXACTLY ONE of path/content. target_activity_codes: list of task_codes to trace; if empty, all CP / near-critical endpoints are traced. direction: 'backward' (predecessors), 'forward' (successors), or 'both' (default). include_near_critical: also trace near-critical endpoints (within float band). output_dir: optional dir for HTML / CSV / JSON outputs. company: optional, the firm the dashboard carries (title block, print cover). Blank unless supplied, and blank carries no firm: a hosted run is the caller's document. Returns: { "paths": [{chain dicts ...}], "output_files": {dashboard, csv, json}, "project_finish": "YYYY-MM-DD", "project_name": ..., "data_date": ... } Not declaredNot declaredNot declaredNot declared
qramm_maturityQRAMM-aligned maturity reading for an SRA result. Places a Schedule Risk Analysis run (from ``monte_carlo_p50_p80`` or any equivalent dict) on the five named maturity levels of AACE RP 122R-22 (Quantitative Risk Analysis Maturity Model), section 3: level 1 Reactive, level 2 Ad-hoc, level 3 Centralized, level 4 Dynamic, level 5 Adaptive. Inputs the SRA inspects (defensively, all keys optional): - baseline.percentiles (lowercase p50 / p80 presence) - baseline.config (iterations, opt/ml/pes %, distribution) - baseline.sensitivity (per-activity tornado rows, on_cp) - mitigated (scenario comparison evidence) - risk_register_simulation + risk_register_used (Hulett quantified risk register evidence) - convergence (MC diagnostics, required for level 5) Use this tool any time you have an SRA result and want a maturity reading for a forensic-claim methodology section. Note the scope limit the badge carries on every render: AACE 122R-22 assesses the quantitative-risk capability of an ORGANIZATION and states it is guidelines rather than a standard, so a reading on one simulation run is CPP's placement on the RP's scale, not a QRAMM score. Report it as "QRAMM-aligned", never as "per AACE 122R-22". Args: sra_result: dict from ``monte_carlo_p50_p80``. May be {} - the badge degrades to level 1 with the missing evidence listed. Returns: { "rp_citation": "AACE RP 122R-22 ...", "scale_max": 5, "scale_note": "... names five levels ...", "level": int (1-5), "level_name": Not declaredNot declaredNot declaredNot declared
slip_velocityPer-window slip velocity & acceleration trend across XER snapshots. Computes three signed metrics per window from the underlying forensic windows analysis: - slip_velocity_days_per_day: completion shift / window duration (positive = slipping, negative = recovering). Numerator is the WORKING-day completion shift. The denominator is WORKING days between the prior and later data dates on the same calendar (``window_duration_workdays``), making this a same-day-type working-day/working-day rate. It falls back to CALENDAR days only for legacy window dicts that predate that field, and such a row is flagged ``velocity_basis="wd/cd"``. Read ``velocity_basis`` to know which denominator produced the figure. Each velocity field name states the ratio it holds: ``slip_velocity_workdays_per_workday`` (populated only on the wd/wd path), ``slip_velocity_workdays_per_calendar_day`` (working-days of slip per CALENDAR day elapsed, computed against ``window_duration_days``), and ``slip_velocity_days_per_day`` as the retained back-compat name for whichever basis was selected. Quote ``basis`` in any expert report. NOTE (2026-09-03): the two named fields are no longer equal. ``slip_velocity_workdays_per_calendar_day`` used to be a blind copy of the headline velocity, which made its name wrong once the denominator moved to working days — it read 5/10 = 0.500 while its name promised 5/14 = 0.357. It now holds the calendar-day rate it is named for. - slip_acceleration: velocity[n] - velocity[n-1] (positive = slip rate increasing, negative = decelNot declaredNot declaredNot declaredNot declared
time_impact_analysis_fragnetTime Impact Analysis (TIA) — prospective fragnet insertion into a pre-impact baseline schedule. Supports two modes. **Single-base mode** (legacy): supply ``baseline_xer_path`` or ``baseline_xer_content``. All fragnets are inserted into the same shared baseline XER and impact is measured against that shared baseline. The result carries a ``single_base_disclosure`` warning: one shared baseline is AACE 29R-03 MIP 3.6 (Modeled / Additive / Single Base), not MIP 3.7 Multiple Base; acceptable when all events share a single baseline window. **Multi-base mode** (AACE 29R-03 MIP 3.7 Multiple Base): supply ``per_event_bases`` — a dict keyed by each fragnet's ``id``, with each value a dict containing EITHER ``xer_path`` OR ``xer_content`` for that event's pre-event contemporaneous baseline. Each fragnet is inserted into its OWN base, impact is measured against THAT base's pre-event finish, and the result carries ``per_event_methodology``, ``per_event_base_count``, and ``per_event_bases_used`` (sha256-truncated content hashes for audit reproducibility). The cumulative-impact figure carries ``cumulative_caveat`` because the sum of events measured against different bases is NOT a valid joint impact. Exactly ONE of {baseline_xer_path, baseline_xer_content, per_event_bases} must be supplied. Multi-base mode refuses the run (a tool error carrying ``{"error": ...}``) before any schedule is read if a fragnet id is missing from ``per_event_bases`` (listed in ``missing_fragnet_ids``), if two fragnets share an id (a fragnet with no id is ``F`` and its position, counted from 1), or if an entry gives neither ``xer_path`` nor ``xer_content``, givNot declaredNot declaredNot declaredNot declared
woet_classifierWorked-vs-On-time Execution Timeline (WOET) per-activity day-by-day classification of as-built execution against baseline. For each pairable activity (matched by ``task_code``), classifies execution into 4 day-states: - PROGRESS: work performed during the baseline-planned window - GAIN: work performed BEFORE the baseline window opened - EXTENDED: work performed AFTER the baseline window closed - VOID: baseline-window day where activity was NOT active This is a CPP-disclosed enhancement layered on top of AACE 29R-03 §3.3 Windows Analysis — a per-day execution classifier (Progress/Gain/Extended/Void) NOT itself AACE-defined. It is not a substitute for fragnet-based AACE 29R-03 §3.7 (TIA) modeling. It gives the trier-of-fact a calendar picture of how the project executed versus how it was supposed to execute, which is otherwise buried in finish-date deltas. Use this tool when you want a per-activity execution-quality picture (on-time %, count of activities with VOID days, etc.). Args: baseline_xer_path: server-side path to baseline XER (target dates). actual_xer_path: server-side path to as-built XER (act dates). baseline_xer_content: full text of baseline XER (alternative). actual_xer_content: full text of as-built XER (alternative). Supply EXACTLY ONE of path/content per pair. today: optional ISO date (YYYY-MM-DD) reference for in-progress activities. Defaults to actual XER's last_recalc_date if available, else today's date. Returns: { "method": "WOET", "standard": "AACE 29R-03 §3.3 Windows Analysis — per-day execution classiNot declaredNot declaredNot declaredNot declared
xer_parserParse a Primavera P6 XER file and return a TABLE SUMMARY (not the full row-level data — XER row dumps explode the MCP context window). For each table in the XER, returns the table name, field list, and record count. Per-row data is intentionally omitted — for forensic / DCMA / windows analysis use the dedicated tools (``forensic_windows_analysis``, ``critical_path_validator``, etc.) which consume the parsed XER internally and return analytical summaries, not raw rows. Use this tool to confirm an XER is parseable, list its tables, see the data date / project name from PROJECT, or count activities in TASK before deciding which deeper tool to run. Args: xer_path: server-side filesystem path to the XER file. xer_content: full text of the XER file (alternative for hosted/remote use). Supply EXACTLY ONE of path/content. Returns: { "filepath": absolute path, "encoding_used": "utf-8" | "cp1252" | ..., "ermhdr": file header dict (P6 version, export user, etc.), "tables": [{"name", "fields", "record_count"}, ...], "table_count": int, "total_records": int, "project_summary": { "proj_id", "proj_short_name", "proj_long_name", "data_date", "plan_end_date" } (from first PROJECT row, if any) } Not declaredNot declaredNot declaredNot declared

Details

Registry status
Active
Published
Nov 10, 2026
Updated
Nov 10, 2026
Categories (suggested)
Invoicing and accountingSuggested categories are assigned automatically from the registry text and may be wrong. Verified operators can correct them.
GDPR
Not declared

Are you the operator? Claim this listing