Entogo power-equipment knowledge & tools
ca.entogo/knowledgeVersion 1.0.0Entogo (Canada) transformers, switchgear, BESS, EV charging: catalogue, lead times, EV sizing, RFQ
Status
Responds375 msAnswered our handshake without sign-in.- Last checked
- Nov 14, 2026, 13:41 UTC
- Latency
- 375 ms
- Remotes responding
- 1 of 1
- Sign-in
- No sign-in
- Hosting
- Hosted outside the EU (detected)
- Registry data as of
- Nov 14, 2026, 21:12 UTC
Data from the official MCP Registry, checked by run.zero. How we check
Connect
Streamable HTTP
https://entogo.ca/mcpResponds375 msNo sign-in
Claude Code
claude mcp add --transport http knowledge https://entogo.ca/mcpClaude Desktop and claude.ai
Settings > Connectors > Add custom connector
Name: knowledge
Remote MCP server URL: https://entogo.ca/mcpCursor
{
"mcpServers": {
"knowledge": {
"url": "https://entogo.ca/mcp"
}
}
}VS Code
code --add-mcp '{"name":"knowledge","type":"http","url":"https://entogo.ca/mcp"}'Built your own server? run.zero hosts MCP servers on European infrastructure.
Tools
7 tools
Read-only | Idempotent | Open world | ||
|---|---|---|---|---|
estimate_ev_charging_capacityRuns the same engine as https://entogo.ca/tools/ev-charging-service-capacity-calculator/: code load (NEC 2023 / NEC 2026 / CEC 2024 Section 86) for a set of Level 2 and DC fast chargers, EMS-managed load when an energy management system is declared, planning-basis load with site diversity, recommended transformer kVA and service / switchboard rating, and a GREEN / YELLOW / RED verdict against an existing service when one is given. Planning estimate only. | Not declared | Yes | Not declared | No |
get_company_factsVerified company facts: legal name, founding, headquarters, contacts and office hours, factory and capacity narrative, lead-time and warranty commitments, certifications, standards position, quote channel and key URLs. | Not declared | Yes | Not declared | No |
get_lead_timeDelivery lead-time band for a product (weeks, purchase order to shipment) plus Entogo's company-wide lead-time and warranty commitments. Bands: catalogue EV chargers 4–8, medium manufactured equipment 16–24, large engineered-to-order systems 16–24 weeks; new cULus / CSA certification can extend a band, to within 36 weeks when the order needs it. IEC/CE equipment built for export markets: about 12 weeks. | Not declared | Yes | Not declared | No |
get_productFull record for one product by catalogue id (slug): specifications, features, applications, FAQs, certifications listed on the page, lead-time band, language editions, Markdown twin and the quote channel. | Not declared | Yes | Not declared | No |
list_productsList products in the catalogue, optionally filtered by category (power = transformers & substations; distribution = switchgear & distribution; storage = battery energy storage; emobility = EV charging & PV-storage-charging) and/or a keyword. Returns compact rows; call get_product for full specifications. | Not declared | Yes | Not declared | No |
request_quote_handoffReturns the right channel for a request for quotation (RFQ): the transformer configurator deep link (pre-filled with the product name), the contact page, e-mail and phone numbers, office hours and the one-business-day response commitment. This tool stores nothing and sends nothing — the user completes the request on entogo.ca or by e-mail. | Not declared | Yes | Not declared | No |
search_knowledgeSemantic search over Entogo's product, solution, manufacturing, certification, lead-time and warranty knowledge (the same index that grounds the Ensight assistant). Returns the best-matching passages with source URLs. | Not declared | Yes | Not declared | No |
Details
- Registry status
- Active
- Published
- Sep 5, 2026
- Updated
- Sep 5, 2026
- Repository
- Not given
- Categories (suggested)
- CRMKnowledge and notesSuggested categories are assigned automatically from the registry text and may be wrong. Verified operators can correct them.
- GDPR
- Not declared