Costable — Parametric Should-Cost Analysis
io.github.1337mofo/costableVersion 1.0.0Parametric should-cost: P50/P80/P90 estimates, 801 materials, 25 countries, quote review.
Status
Responds525 msAnswered our handshake without sign-in.- Last checked
- Nov 14, 2026, 14:34 UTC
- Latency
- 525 ms
- Remotes responding
- 1 of 1
- Sign-in
- No sign-in
- Hosting
- Hosted outside the EU (detected)
- Registry data as of
- Nov 14, 2026, 21:12 UTC
Data from the official MCP Registry, checked by run.zero. How we check
Connect
Streamable HTTP
https://costable.ai/api/mcpResponds525 msNo sign-in
Claude Code
claude mcp add --transport http costable https://costable.ai/api/mcpClaude Desktop and claude.ai
Settings > Connectors > Add custom connector
Name: costable
Remote MCP server URL: https://costable.ai/api/mcpCursor
{
"mcpServers": {
"costable": {
"url": "https://costable.ai/api/mcp"
}
}
}VS Code
code --add-mcp '{"name":"costable","type":"http","url":"https://costable.ai/api/mcp"}'Built your own server? run.zero hosts MCP servers on European infrastructure.
Tools
10 tools
Read-only | Idempotent | Open world | ||
|---|---|---|---|---|
add_material_to_modelAdd a material (BOM line) to an existing cost model. Searches the materials database by name query — no need for exact IDs. | Not declared | Not declared | Not declared | Not declared |
add_process_to_modelAdd a manufacturing process step to an existing cost model. Searches the process database by name query — no need for exact IDs. | Not declared | Not declared | Not declared | Not declared |
calculate_cost_modelRun the Monte Carlo should-cost calculation on a cost model. Returns P50 (median), P80 and P90 cost-at-risk per unit, plus a full cost breakdown (material, labour, machine, overhead, margin). | Not declared | Not declared | Not declared | Not declared |
compare_manufacturing_countriesRun the cost model across multiple manufacturing countries simultaneously to identify the optimal sourcing location. Returns P50/P80/P90 per country and % delta vs baseline. | Not declared | Not declared | Not declared | Not declared |
create_cost_modelCreate a new parametric cost model in Costable. Returns the model ID which is used by add_material_to_model, add_process_to_model, calculate_cost_model, and compare_manufacturing_countries. | Not declared | Not declared | Not declared | Not declared |
estimate_partInstantly estimate the should-cost of a manufactured part using natural language. Returns P50 (median), P80 and P90 cost-at-risk per unit based on Monte Carlo simulation of material price variance, labour rate variance and cycle time uncertainty. Use this for quick feasibility checks before building a full cost model. | Not declared | Not declared | Not declared | Not declared |
get_labour_ratesGet manufacturing labour rates ($/hr) for all skill levels in a given country. Data covers 16 skill levels across 25 countries (ILO/BLS/ABS sourced). | Not declared | Not declared | Not declared | Not declared |
review_supplier_quoteAnalyse a supplier quote against Costable's should-cost benchmarks. Returns a line-by-line delta (% over/under should-cost), verdict (LOW / COMPETITIVE / HIGH / VERY HIGH), and a list of the top items to challenge in negotiation. | Not declared | Not declared | Not declared | Not declared |
search_materialsSearch the Costable materials database (37 materials with LME-sourced pricing). Returns material name, category, price per kg, density, and strength properties. | Not declared | Not declared | Not declared | Not declared |
search_processesSearch the Costable manufacturing process database (41 processes). Returns process name, category, machine rate ($/hr), and cycle time model. | Not declared | Not declared | Not declared | Not declared |
Details
- Registry status
- Active
- Published
- Aug 22, 2026
- Updated
- Aug 22, 2026
- Website
- Not given
- Repository
- Not given
- Categories
- Uncategorized
- GDPR
- Not declared